- Client: gulftainer
- location: sharjah port
- Value: 2.2M
- Year: 2018
Various works for Gulftainer at the Sharjah Port included the expansion of a container terminal by demolishing an existing warehouse to create additional space. Also installing reinforced concrete beams for the retainer straddle carriers. New lighting masts were fabricated and installed in the ground with steel towers.